Technical specifications

Scope of work

  • Total length 120 m, approx. 75 m drive under historical Kaufhof-Building
  • Connection to station Heinrich-Heine-Allee
  • Tunnel with segmental lining Lot 1

Construction method 

  • Start- and reception cavern with diphragm walls
  • Navigated horizontal drilling R = 350 m for ground freezing
  • Excavation with tunnel excavator in two segments with shortcrete

General data

Project

Wehrhahnlinie Lot 2


Client

Landeshauptstadt (regional federal land capital of) Düsseldorf
Amt für Verkehrsmanagement (authority for traffic management)

Contractor

Wayss & Freytag Ingenieurbau AG
as technical leader of a joint venture

Construction period

2007 to 2016

Construction costs

€ 74 million
Usage
Infrastructure
Type
Metro tunnel
Length
Length 120 m
Construction Method
Tunnel excavator