Technical specifications

General data

Client:
Himmel u. Papesch GmbH & Co.KG, NL Spezialtiefbau Süd

Employer:
50Hertz Transmission GmbH 04849 Bad Düben

Contract value:
47,500 €

Construction period:
December 2013

In the course of the construction of the 380-kV-power supply line from Vieselbach to Altenfeld in the Thuringian Forest south of Erfurt, micro pile foundations were carried out for the foundations of the power poles at positions 77 and 98.

For this, 42 GEWI 50 mm (threaded bars) with double corrosion protection and individual lengths of 12.5 m with a bore diameter of 178 mm were built. The real challenge of this project lay in the logistics and the supply of equipment and material, since, according to the planned alignment, the power poles were located in open or wooded terrain.

 

Related Projects

Related Projects

Rehabilitation of a Sheet Pile Harbour Wall in Mühlheim an der Ruhr
Rehabilitation of a Sheet Pile Harbour Wall in Mühlheim an der Ruhr
Germany

Rehabilitation of a Sheet Pile Harbour Wall in Mühlheim an der Ruhr

Read more
Light railway, Karlsruhe
Light railway, Karlsruhe
Germany

Anchors secure construction pit in Karlsruhe against groundwater

Read more
Retaining wall A 40 intersection „Westkreuz Bochum”
Retaining wall A 40 intersection „Westkreuz Bochum”
Germany

GEWI-tension piles secure retaining wall

Read more